Terre Haute Main Lift Station Replacement
Terre Haute, Indiana
This major infrastructure improvement project involved the replacement of the sanitary lift station west of Prairieton Road, including construction of a 22-million-gallon-per-day (MGD) facility, approximately 320 linear feet of 30-inch force main, new cast-in-place concrete structures, a masonry valve vault, and an equipment building housing pumps, electrical systems, and a backup generator.
Patriot supported the project with comprehensive materials testing and construction inspection services. Our scope included soil and earthwork testing (field density, proofrolling, and footing excavation observations), concrete testing, reinforcing steel inspection, and structural steel and weld inspections.