Skip to Content
chevron-left chevron-right chevron-up chevron-right chevron-left arrow-back star phone quote checkbox-checked search wrench info shield play connection mobile coin-dollar spoon-knife ticket pushpin location gift fire feed bubbles home heart calendar price-tag credit-card clock envelop facebook instagram twitter youtube pinterest yelp google reddit linkedin envelope bbb pinterest homeadvisor angies
Cincinnati

Cincinnati, Ohio

Construction began on this 400,000-square-foot GM Distribution Center with a fast-track schedule for completion in just eight months. Patriot’s services for this project included special inspections, lime soil stabilization, concrete, asphalt, structural steel, masonry, and roofing testing and observations. Patriot also performed Floor Flatness and Floor Levelness within 12 hours of completion of each 60,000 square feet of concrete placement. Patriot’s staff consisted of a Senior Engineering Technician on-site full time with three additional technicians on call to assist when needed. Patriot’s accredited laboratory maintained a 24 to 48-hour turnaround on all soils, concrete, and asphalt samples for testing.

Reduce Costs, Decrease Risks, and Improve Outcomes