PROJECTS LISTING

OUR PHILOSOPHY

A company with very experienced people

Professionals with fresh attitudes

Using modern technology

Committed to being responsive

Offering solutions that are innovative

Extremely client oriented

Ready to join your project team.

To download our brochure in .pdf format Click Here

GM Distribution Center - Trotwood, Ohio

Construction began on this 400,000 square feet GM Distribution Center (Trotwood Warehouse) in January 2008 with a fast track schedule for completion in August 2008. Our primary contact for this project was Mr. Chuck Cornell (248-521-3263) Construction Manager for Oliver / Hatcher Construction. The Project Engineer was Paul Bater with Professional Engineering Associates, Inc (248-689-9090). Patriot's services for this project included special inspections, lime / cement soil stabilization, concrete, asphalt, structural steel, masonry, and roofing testing and observations. Patriot also preformed Floor Flatness and Floor Levelness within 12 hours of completion of each 60,000 square feet of concrete placement. Patriot's staff consisted of a Senior Engineering Technician on site full time with three additional technicians on call to assist when needed. Patriot's local laboratory maintained a 24 to 48 hour turnaround on all soils, concrete, and asphalt samples for testing.